During petal integration some modules has been broken, we have to analyse for each problem in order to improve the mounting/dismounting scenario.

 

A preliminary report describes potentail problems and solutions under study to improve these process: Risk analysis Report V1.pdf

This risk analysis goal is to obtain information about all PIC center and analyse it, make a synthesis, to centralise information and to distribute these information to PICs with validated solution (if we have one) for each problem.

 

The scenario to realise this risk analyse is:

 

Problem appeared front Risk Analysis Start (October 2005)

Recover informations needed in table below or in word file.

Answer to these form and send it to Strasbourg, this for each module broken or probleme appeared.

Problem appeared after Write in CMS Tracker Failure DB interface all information needed in short and full description form, like described after

The page Petal Integration Risk Analysis Table Report Graph: Indicates number of modules with problem during petal integration for each week.

The page Petal Integration Risk Analysis Study: Describes results of risk analysis for improvements in petal integration scenario with problem list, solutions proposed and solution validation

 

Case 1: Problem appeared front Risk Analysis Start (October 2005)
Word file template Risk Analysis Template.doc
PDF file template Risk Analysis Template.pdf

 

Case 2: Problem appeared after Risk Analysis Start (October 2005)
Report informations inside Failures modules DB http://cms.ct.infn.it/failures/
Choose in Failure type PIC
In short Description Explanations of Problem with summary description
In full Description

Details:

- Instant : MOUNTING / UNMOUNTING / REMOUNTING

- Petal ID :

- Due to:

- Concequences :

 

View of Module Failure Report DB: