During petal integration some modules has been broken, we have to analyse for each problem in order to improve the mounting/dismounting scenario.
A preliminary report describes potentail problems and solutions under study to improve these process: Risk analysis Report V1.pdf
This risk analysis goal is to obtain information about all PIC center and analyse it, make a synthesis, to centralise information and to distribute these information to PICs with validated solution (if we have one) for each problem.
The scenario to realise this risk analyse is:
| Problem appeared front Risk Analysis Start (October 2005) | Recover informations needed in table below or in word file. Answer to these form and send it to Strasbourg, this for each module broken or probleme appeared. |
| Problem appeared after | Write in CMS Tracker Failure DB interface all information needed in short and full description form, like described after |
The page Petal Integration Risk Analysis Table Report Graph: Indicates number of modules with problem during petal integration for each week.
The page Petal Integration Risk Analysis Study: Describes results of risk analysis for improvements in petal integration scenario with problem list, solutions proposed and solution validation
Case 1: Problem appeared front Risk Analysis Start (October 2005) |
|
| Word file template | Risk Analysis Template.doc |
| PDF file template | Risk Analysis Template.pdf |
Case 2: Problem appeared after Risk Analysis Start (October 2005) |
|
| Report informations inside Failures modules DB | http://cms.ct.infn.it/failures/ |
| Choose in Failure type | PIC |
| In short Description | Explanations of Problem with summary description |
| In full Description | Details: - Instant : MOUNTING / UNMOUNTING / REMOUNTING - Petal ID : - Due to: - Concequences :
|
View of Module Failure Report DB:
![]() |
